EC
Line EC
In the last 30 days, 46% of the 679 trains with data on line EC finished less than 3 min late (29 days with data). Mean final delay: +6 min. TrainsRadar data as of 22 Nov 2026, 01:08 (GMT+1).
Reliability ยท Last 30 days
EC in Italy ยท excludes EC in Belgium, Switzerland, Czechia, Germany or Poland46%
arrive under 3 min late (310 of 679 measured runs)
+5.5 min
weighted average delay
Small sample: ~23 measured runs a day out of ~24 trains seen.
Average delay by day and hour
Last 5 weeks ยท local time Europe/Rome 036912151821
M
T
W
T
F
S
S
Early < โ1 minOn time โ1 to 3 minSlight 3 to 10 minLate 10 to 30 minSevere โฅ 30 min No data
Hover or focus a cell to see the average delay.
Schedule
Timetable not linked: the line name in the live feed matches no route of the published timetable. Running trains are listed below.
Live now
- Active trains
- 0
- On time
- โ
- of 0 trains with delay data
- Average delay
- โ
No active trains on this line
Data: the operatorโs GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time ยท Europe/Rome