Too few trains with delay data on line 42 DB Regio AG Baden-Württemberg yet to give a punctuality figure: 0 on 0 of the last 30 days (100 needed, on at least 20 days). TrainsRadar data as of 28 Nov 2026, 16:01 (GMT+1).
Reliability · Last 30 days
42 in Switzerland · excludes 42 in NorwayNo measured days for this line yet: they appear once its trains report their delay in real time.
Schedule
Saturday 28 Nov · services running that day| Rottweil | Deisslingen Mitte | Trossingen Bahnhof | Sch. Hammerstatt | Schwenningen (Neckar) | Sch. Zollhaus | Sch. Marbach Ost | Villingen (Schwarzw) |
|---|---|---|---|---|---|---|---|
| 07:28 | 07:35 | 07:40 | 07:45 | 07:47 | 07:51 | 07:54 | 07:58 |
1 departures in the morning · columns in travel order Rottweil → Villingen (Schwarzw) “—” = the train does not stop there
Routes (2)
Live now
- Active trains
- 0
- On time
- —
- of 0 trains with delay data
- Average delay
- —
No active trains on this line
Stations (9)
Data: the operator’s GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time · Europe/Zurich