LIRR 8821 Jamaica – Atlantic Terminal

View line LIRR

Jamaica 05:35 → Atlantic Terminal 05:55 Sat, Sun 0 h 20 min · 4 stops Long Island Rail Road

It does not run today

Last recorded run: Sunday 27 September +2 min

Next service: Saturday 05:35 from Jamaica · Sat 14 Nov

Next departure 05:35 Saturday · Jamaica
On-time · 30 days
—
Too little data (0/0 runs with data)
RT coverage: 0 full · 0 partial · 0 no data
On-time · 90 days
82%
9/11 runs under 3 min
RT coverage: 9 full · 2 partial · 0 no data
Typical delay
+1min
Median at arrival, 90 days
P90
+3min
9 in 10 runs arrive with less than this

Last 30 days

Arrival delay at Atlantic Terminal, in minutes. One bar per run.

  • On time (<3 min)
  • 3–10 min
  • 10–30 min
  • 30+ min
  • Partial coverage
  • No data

Worst days

  • Sat 5 Sept Max en route +4 min · last fix heading to 241 +4 min
  • Sat 29 Aug Max en route +3 min · last fix heading to 241 +3 min

Distribution · 90 days

11 runs with a known final delay. On time = under 3 min, the same cut the map uses.

  • Early 0% · 0
  • On time 82% · 9
  • 3–10 min 18% · 2
  • 10–30 min 0% · 0
  • 30+ min 0% · 0

On-time by weekday

  • 100% M n=1
  • — T n=0
  • — W n=0
  • — T n=0
  • — F n=0
  • 60% S n=5
  • 100% S n=5

Stops and timetable

Timetable of the latest run from the operator’s GTFS (4 stops).

Last 90 days, 11 runs. At intermediate stops it is an estimate from the delay at origin and destination. Delays over 2 h count as “> 2 h”: our data does not measure them exactly.

StopSched.Usually 9 days in 10
05:35on time on time
05:44≈ on time ≈ +2 min
05:49≈ +1 min ≈ +3 min
05:55+1 min +3 min

Each run is closed into train_runs (country, train number, service day) from the live positions. Final delay = last delay seen. Partial coverage: the feed stopped before the final stop (last value used, hatched in the chart). No data: a run without any valid delay; counts as neither on time nor late. Data collected since 10 July 2026.

Will I make my connection?

Pick where you get off and how many minutes you have until your next train. We work it out from what this train did over the last 90 days.

Include the time to change platforms. It is an estimate from past data, not a guarantee. Days more than 2 h late count as a missed connection.

Recent runs

DateLast stopFinalMax
Sun 27 Sept241 06:25Partial coverage+2 min+2 min
Sat 26 Sept241 06:26Partial coverage+1 min+1 min
Mon 7 Sept241 06:25+1 min+1 min
Sun 6 Sept241 06:250 min—
Sat 5 Sept241 06:32+4 min+4 min
Sun 30 Aug241 06:25+1 min—
Sat 29 Aug241 06:28+3 min+3 min
Sun 23 Aug241 06:240 min—
Sat 22 Aug241 06:26+1 min+1 min
Sun 16 Aug241 06:25+1 min—
Sat 15 Aug241 06:25+1 min—