Metro-North 8807 Grand Central – Poughkeepsie

View line Metro-North

Grand Central 07:57 → Poughkeepsie 09:59 Sat, Sun 2 h 02 min · 11 stops MTA Metro-North

It does not run today

Last recorded run: Sunday 11 October No data

Next service: tomorrow 07:57 from Grand Central · Sat 17 Oct

Next departure 07:57 tomorrow · Grand Central
On-time · 30 days
—
Too little data (0/6 runs with data)
RT coverage: 0 full · 0 partial · 6 no data
On-time · 90 days
—
Too little data (0/8 runs with data)
RT coverage: 0 full · 0 partial · 8 no data
Typical delay
—
Needs at least 5 runs with data (0 so far)
P90
—
Needs at least 5 runs with data (0 so far)

Last 30 days

Arrival delay at Poughkeepsie, in minutes. One bar per run.

  • On time (<3 min)
  • 3–10 min
  • 10–30 min
  • 30+ min
  • Partial coverage
  • No data

Distribution · 90 days

No runs with a known final delay yet.

On-time by weekday

  • — M n=0
  • — T n=0
  • — W n=0
  • — T n=0
  • — F n=0
  • — S n=0
  • — S n=0

Stops and timetable

Timetable of the latest run from the operator’s GTFS (11 stops).

Each run is closed into train_runs (country, train number, service day) from the live positions. Final delay = last delay seen. Partial coverage: the feed stopped before the final stop (last value used, hatched in the chart). No data: a run without any valid delay; counts as neither on time nor late. Data collected since 10 July 2026.

Recent runs

DateLast stopFinalMax
Sun 11 OctPoughkeepsie 09:48No data—
Sat 10 OctPoughkeepsie 09:45No data—
Sun 4 Oct51 09:43No data—
Sat 3 Oct51 09:45No data—
Sun 27 Sept51 09:46No data—
Sat 26 Sept51 09:44No data—
Sun 30 Aug46 09:29No data—
Sat 29 Aug46 09:32No data—