LIRR 7101 Port Washington → Penn Station

View line LIRR

Port Washington 07:25 → Penn Station 08:13 Thu, Sat, Sun 0 h 48 min · 14 stops MTA LIRR

Train 7101 Port Washington–Penn Station: too few runs with delay data yet to give its punctuality (1 in the last 30 days; 3 needed). TrainsRadar data as of 25 Nov 2026, 06:44 (GMT-5).

It does not run today

Last recorded run: Saturday 21 November +4 min

Next service: tomorrow 07:25 from Port Washington · Thu 26 Nov

Next departure 07:25 tomorrow · Port Washington
On-time · 30 days
—
Too little data (1/1 runs with data)
RT coverage: 1 full · 0 partial · 0 no data
On-time · 90 days
—
Too little data (1/2 runs with data)
RT coverage: 1 full · 0 partial · 1 no data
Typical delay
—
Needs at least 5 runs with data (1 so far)
P90
—
Needs at least 5 runs with data (1 so far)

Last 30 days

Arrival delay at Penn Station, in minutes. One bar per run.

  • On time (<3 min)
  • 3–10 min
  • 10–30 min
  • 30+ min
  • Partial coverage
  • No data

Worst days

  • Sat 21 Nov Max en route +4 min · last fix heading to Penn Station +4 min

Distribution · 90 days

1 runs with a known final delay. On time = under 3 min, the same cut the map uses.

  • Early 0% · 0
  • On time 0% · 0
  • 3–10 min 100% · 1
  • 10–30 min 0% · 0
  • 30+ min 0% · 0

On-time by weekday

  • — M n=0
  • — T n=0
  • — W n=0
  • — T n=0
  • — F n=0
  • 0% S n=1
  • — S n=0

Stops and timetable

Timetable of the latest run from the operator’s GTFS (14 stops).

Not enough runs yet to work out the usual delay by stop.

Each run is closed into train_runs (country, train number, service day) from the live positions. Final delay = last delay seen. Partial coverage: the feed stopped before the final stop (last value used, hatched in the chart). No data: a run without any valid delay; counts as neither on time nor late. Data collected since 10 July 2026.

Recent runs

DateLast stopFinalMax
Sat 21 NovPenn Station 08:56+4 min+4 min
Mon 5 Oct— 06:18No data—