LIRR 6850 Penn Station – Long Beach

View line LIRR

Penn Station 12:06 → Long Beach 13:02 Sat, Sun 0 h 56 min · 12 stops Metro-North Railroad

It does not run today

Last recorded run: Saturday 3 October +2 min

Next service: Saturday 12:06 from Penn Station · Sat 7 Nov

Next departure 12:06 Saturday · Penn Station
On-time · 30 days
—
Too little data (0/0 runs with data)
RT coverage: 0 full · 0 partial · 0 no data
On-time · 90 days
100%
13/13 runs under 3 min
RT coverage: 10 full · 3 partial · 0 no data
Typical delay
0min
Median at arrival, 90 days
P90
+1min
9 in 10 runs arrive with less than this

Last 30 days

Arrival delay at Long Beach, in minutes. One bar per run.

  • On time (<3 min)
  • 3–10 min
  • 10–30 min
  • 30+ min
  • Partial coverage
  • No data

Distribution · 90 days

13 runs with a known final delay. On time = under 3 min, the same cut the map uses.

  • Early 15% · 2
  • On time 85% · 11
  • 3–10 min 0% · 0
  • 10–30 min 0% · 0
  • 30+ min 0% · 0

On-time by weekday

  • 100% M n=1
  • — T n=0
  • — W n=0
  • — T n=0
  • — F n=0
  • 100% S n=6
  • 100% S n=6

Stops and timetable

Timetable of the latest run from the operator’s GTFS (12 stops).

Last 90 days, 13 runs. At intermediate stops it is an estimate from the delay at origin and destination. Delays over 2 h count as “> 2 h”: our data does not measure them exactly.

StopSched.Usually 9 days in 10
12:06on time on time
12:26 / 12:28≈ on time ≈ on time
12:34≈ on time ≈ on time
12:36≈ on time ≈ on time
12:39≈ on time ≈ on time
12:42≈ on time ≈ on time
12:45≈ on time ≈ on time
12:47≈ on time ≈ on time
12:49≈ on time ≈ on time
12:51≈ on time ≈ on time
12:55≈ 1 min early ≈ on time
13:021 min early on time

Each run is closed into train_runs (country, train number, service day) from the live positions. Final delay = last delay seen. Partial coverage: the feed stopped before the final stop (last value used, hatched in the chart). No data: a run without any valid delay; counts as neither on time nor late. Data collected since 10 July 2026.

Will I make my connection?

Pick where you get off and how many minutes you have until your next train. We work it out from what this train did over the last 90 days.

Include the time to change platforms. It is an estimate from past data, not a guarantee. Days more than 2 h late count as a missed connection.

Recent runs

DateLast stopFinalMax
Sat 3 Oct113 13:33Partial coverage+2 min+3 min
Sun 20 Sept113 13:31Partial coverage0 min+2 min
Sat 19 Sept113 13:32Partial coverage+1 min+2 min
Mon 7 Sept113 13:320 min+2 min
Sun 6 Sept113 13:32−2 min—
Sat 5 Sept113 13:320 min+2 min
Sun 30 Aug113 13:31−1 min+1 min
Sat 29 Aug113 13:31−1 min—
Sun 23 Aug113 13:320 min+4 min
Sat 22 Aug113 13:30−1 min+1 min
Sun 16 Aug113 13:31−1 min+1 min
Sat 15 Aug113 13:31−1 min—
Sun 9 Aug113 13:340 min+1 min