CR-Lowell 5374 Lowell – North Station

View line CR-Lowell

Lowell 19:22 → North Station 20:07 0 h 45 min · 8 stops MBTA

Not running right now

Last recorded run: Saturday 26 September 0 min

On-time · 30 days
—
Too little data (0/0 runs with data)
RT coverage: 0 full · 0 partial · 0 no data
On-time · 90 days
100%
13/13 runs under 3 min
RT coverage: 1 full · 12 partial · 0 no data
Typical delay
0min
Median at arrival, 90 days
P90
0min
9 in 10 runs arrive with less than this

Last 30 days

Arrival delay at North Station, in minutes. One bar per run.

  • On time (<3 min)
  • 3–10 min
  • 10–30 min
  • 30+ min
  • Partial coverage
  • No data

Distribution · 90 days

13 runs with a known final delay. On time = under 3 min, the same cut the map uses.

  • Early 0% · 0
  • On time 100% · 13
  • 3–10 min 0% · 0
  • 10–30 min 0% · 0
  • 30+ min 0% · 0

On-time by weekday

  • — M n=0
  • — T n=0
  • — W n=0
  • — T n=0
  • 100% F n=5
  • 100% S n=4
  • 100% S n=4

Stops and timetable

Timetable of the latest run from the operator’s GTFS (8 stops).

Each run is closed into train_runs (country, train number, service day) from the live positions. Final delay = last delay seen. Partial coverage: the feed stopped before the final stop (last value used, hatched in the chart). No data: a run without any valid delay; counts as neither on time nor late. Data collected since 10 July 2026.

Recent runs

DateLast stopFinalMax
Sat 26 SeptBNT-0000 19:59Partial coverage0 min—
Sat 19 SeptBNT-0000 19:58Partial coverage0 min—
Fri 18 SeptBNT-0000 19:58Partial coverage0 min—
Sun 13 SeptBNT-0000 19:59Partial coverage0 min—
Sat 12 SeptBNT-0000 19:58Partial coverage0 min—
Sun 6 SeptBNT-0000 19:59Partial coverage0 min—
Sat 5 SeptBNT-0000 19:59Partial coverage0 min—
Fri 28 AugBNT-0000 19:590 min—
Sun 23 AugBNT-0000 19:59Partial coverage0 min—
Fri 21 AugNHRML-0127-02 19:59Partial coverage0 min—
Sun 16 AugBNT-0000 19:59Partial coverage0 min—
Fri 14 AugBNT-0000 19:58Partial coverage0 min—
Fri 7 AugBNT-0000 19:58Partial coverage0 min—