E955 E955 Grand Canal Dock – Howth

View line E955

Grand Canal Dock 13:10 → Howth 13:43 Sat 0 h 33 min · 13 stops Iarnród Éireann

It does not run today

Last recorded run: Sunday 4 October +2 min

Next service: Saturday 13:10 from Grand Canal Dock · Sat 24 Oct

Next departure 13:10 Saturday · Grand Canal Dock
On-time · 30 days
—
Too little data (2/2 runs with data)
RT coverage: 2 full · 0 partial · 0 no data
On-time · 90 days
50%
2/4 runs under 3 min
RT coverage: 4 full · 0 partial · 0 no data
Typical delay
—
Needs at least 5 runs with data (4 so far)
P90
—
Needs at least 5 runs with data (4 so far)

Last 30 days

Arrival delay at Howth, in minutes. One bar per run.

  • On time (<3 min)
  • 3–10 min
  • 10–30 min
  • 30+ min
  • Partial coverage
  • No data

Worst days

  • Sat 3 Oct Max en route +7 min · last fix heading to — +5 min
  • Sun 13 Sept Max en route +6 min · last fix heading to — +4 min

Distribution · 90 days

4 runs with a known final delay. On time = under 3 min, the same cut the map uses.

  • Early 0% · 0
  • On time 50% · 2
  • 3–10 min 50% · 2
  • 10–30 min 0% · 0
  • 30+ min 0% · 0

On-time by weekday

  • — M n=0
  • — T n=0
  • — W n=0
  • — T n=0
  • — F n=0
  • 50% S n=2
  • 50% S n=2

Stops and timetable

Timetable of the latest run from the operator’s GTFS (13 stops).

StopSched.
13:10
13:11 / 13:12
13:14 / 13:15
13:16 / 13:17
13:21 / 13:22
13:24
13:26 / 13:27
13:28 / 13:29
13:30 / 13:31
13:32 / 13:33
13:34 / 13:35
13:36 / 13:37
13:43

Each run is closed into train_runs (country, train number, service day) from the live positions. Final delay = last delay seen. Partial coverage: the feed stopped before the final stop (last value used, hatched in the chart). No data: a run without any valid delay; counts as neither on time nor late. Data collected since 11 July 2026.

Recent runs

DateLast stopFinalMax
Sun 4 Oct— 13:56+2 min+5 min
Sat 3 Oct— 10:24+5 min+7 min
Sun 13 Sept— 13:57+4 min+6 min
Sat 12 Sept— 10:18+1 min+2 min