Govia Thameslink Railway 639O01 St Albans City – Sutton (London)

View line Govia Thameslink Railway

St Albans City 22:07 → Sutton (London) 23:25 1 h 18 min · 19 stops Govia Thameslink Railway

Not running right now

Last recorded run: Thursday 17 September +1 min

On-time · 30 days
67%
2/3 runs under 3 min
RT coverage: 2 full · 1 partial · 0 no data
On-time · 90 days
67%
2/3 runs under 3 min
RT coverage: 2 full · 1 partial · 0 no data
Typical delay
—
Needs at least 5 runs with data (3 so far)
P90
—
Needs at least 5 runs with data (3 so far)

Last 30 days

Arrival delay at Sutton (London), in minutes. One bar per run.

  • On time (<3 min)
  • 3–10 min
  • 10–30 min
  • 30+ min
  • Partial coverage
  • No data

Worst days

  • Wed 16 Sept Max en route +10 min · last fix heading to 63209 +10 min

Distribution · 90 days

3 runs with a known final delay. On time = under 3 min, the same cut the map uses.

  • Early 0% · 0
  • On time 67% · 2
  • 3–10 min 0% · 0
  • 10–30 min 33% · 1
  • 30+ min 0% · 0

On-time by weekday

  • 100% M n=1
  • — T n=0
  • 0% W n=1
  • 100% T n=1
  • — F n=0
  • — S n=0
  • — S n=0

Stops and timetable

Timetable of the latest run from the operator’s GTFS (19 stops).

Each run is closed into train_runs (country, train number, service day) from the live positions. Final delay = last delay seen. Partial coverage: the feed stopped before the final stop (last value used, hatched in the chart). No data: a run without any valid delay; counts as neither on time nor late. Data collected since 11 July 2026.

Recent runs

DateLast stopFinalMax
Thu 17 SeptSutton (London) 23:34+1 min+2 min
Wed 16 Sept63209 23:22Partial coverage+10 min+10 min
Mon 14 SeptSutton (London) 23:36+2 min+6 min