Were trains on time in the United Kingdom in September 2026?
In September 2026, 72.3% of the 544,278 trains with a known delay in the United Kingdom ended less than 3 min late (last known delay), out of 544,312 trains tracked (100% with data). Median delay: 0 min; 90% of trains below 8 min. Figure closed on 21 Nov 2026: it no longer changes.
- Punctuality (last known delay, under 3 minutes)72.3 %
0.0 pp vs August 2026 ยท 95 % CI: 72.2โ72.4 %
- Trains with data544,278
of 544,312 tracked ยท coverage 100%
- Median delay0 min
90th percentile: 8 min
- Average delay2.3 min
last known delay
Source of these cards and rankings: train_runs and line_daily_stats for the month (last delay seen for each train, over the trains seen); the Wilson CIs are for that figure. The ยซover scheduled trainsยป table uses another base (arrival at destination over scheduled trains) and may give another figure.
Most punctual operators
at least 3,000 trains with a known delay| # | Operator | On time |
|---|---|---|
| 1 | Merseyrail ๐ฌ๐ง GB | 90.8 % 90.4โ91.2 |
| 2 | ScotRail ๐ฌ๐ง GB | 83.5 % 83.1โ83.8 |
| 3 | Greater Anglia ๐ฌ๐ง GB | 81.1 % 80.7โ81.5 |
| 4 | London Underground ๐ฌ๐ง GB | 79.5 % 78.1โ80.9 |
| 5 | Chiltern Railways ๐ฌ๐ง GB | 79.4 % 78.6โ80.2 |
| 6 | Transport for Wales ๐ฌ๐ง GB | 78.4 % 77.9โ78.8 |
| 7 | London Overground ๐ฌ๐ง GB | 76.5 % 76.1โ76.9 |
| 8 | Northern ๐ฌ๐ง GB | 74.7 % 74.4โ75.1 |
| 9 | Elizabeth line ๐ฌ๐ง GB | 74.4 % 73.6โ75.2 |
| 10 | West Midlands Trains ๐ฌ๐ง GB | 72.7 % 72.2โ73.2 |
| 11 | Heathrow Express ๐ฌ๐ง GB | 71.9 % 70.5โ73.3 |
| 12 | Southeastern ๐ฌ๐ง GB | 71.1 % 70.7โ71.6 |
| 13 | GWR ๐ฌ๐ง GB | 70.4 % 70.0โ70.8 |
| 14 | South Western Railway ๐ฌ๐ง GB | 69.6 % 69.1โ70.1 |
| 15 | TransPennine Express ๐ฌ๐ง GB | 66.9 % 66.0โ67.8 |
Least punctual operators
at least 3,000 trains with a known delay| # | Operator | On time |
|---|---|---|
| 21 | Avanti West Coast ๐ฌ๐ง GB | 31.2 % 30.2โ32.2 |
| 20 | CrossCountry ๐ฌ๐ง GB | 42.9 % 41.8โ44.0 |
| 19 | LNER ๐ฌ๐ง GB | 50.4 % 49.1โ51.7 |
| 18 | East Midlands Railway ๐ฌ๐ง GB | 61.5 % 60.7โ62.3 |
| 17 | c2c ๐ฌ๐ง GB | 63.1 % 62.1โ64.2 |
| 16 | Govia Thameslink Railway ๐ฌ๐ง GB | 64.0 % 63.6โ64.3 |
This month there are no lines in the United Kingdom with 1,000 or more trains with data in the per-line record, so there is no line ranking.
By type of train (September 2026)
category assigned by TrainsRadar, not the commercial brand; with 1,000 or more trains with data| Type of train | With data | On time (< 3 min) | 95% CI |
|---|---|---|---|
| Regional | 289,858 | 71.3% | 71.2%โ71.5% |
| Long distance / InterCity | 114,612 | 75% | 74.7%โ75.2% |
| Suburban / S-Bahn | 83,597 | 73.7% | 73.4%โ74% |
| Regional express | 56,211 | 69.8% | 69.4%โ70.2% |
Our threshold and the official one
Our main figure counts a train as on time if its last known delay is under 3 minutes, at any point of its route. It is the same rule for every country and nobodyโs official figure: operators usually measure at arrival at destination, at 5, 6 or 15 minutes, sometimes per passenger.
We do not yet have enough arrivals at destination for this country to compute punctuality at 5, 6 and 15 minutes.
Official thresholds by country
ORR / Network Rail PPM (Public Performance Measure)
Threshold: < 5 min (London & South East, Regional, Scotland); < 10 min (Long Distance)
No column in this report uses exactly this threshold.
- They count cancellations as late; we keep them apart.
Where a train fails to stop at one or more booked calling points on the journey, the train is considered to have failed PPM
Official source ยท checked on 21 November 2026ORR / Network Rail On Time, Time to 3, Time to 15
Threshold: < 1 min, < 3 min, < 15 min
Our column with the same threshold: < 15 min at destination.
- They measure at every stop; we only measure on arrival at destination.
On Time measures the percentage of recorded station stops arrived at early or less than one minute after the scheduled time
Official source ยท checked on 21 November 2026
Our figure also only includes trains that appear in open data and whose arrival we saw, not every train the operator runs. How we measure
How to cite this report
How to cite this report
In a news story
Source: TrainsRadar, punctuality report for September 2026 (https://trainsradar.com/reports/2026-09)
In academic work
TrainsRadar team (2026). Monthly rail punctuality report: September 2026 [data set]. TrainsRadar. https://trainsradar.com/reports/2026-09
Reusing the data
This report combines sources whose licence we have not confirmed yet, so it carries no open licence: you may quote its figures citing the source.
The licence for reusing the press version is still to be confirmed. Meanwhile, cite the source; to reuse the data, write to us.
Press version
Only countries whose sources allow commercial use, one file per licence:
How it is calculated
- On time = less than 3 min late on the last known delay of each train, the same rule on every TrainsRadar page. Only trains whose delay we know are counted. It is not any operatorโs official figure.
- We give a monthโs figure when we know the delay of at least 3,000 trains and 30% of the trains tracked. Below that, no figure is published and the page is not offered to search engines.
- These figures do not say why trains are late: TrainsRadar does not attribute causes (strikes, storms, engineering works) that the data does not show.
- Full methodology