SPR 8700
Line SPR 8700
· R-net
Alphen a/d Rijn – Gouda
Too few trains with delay data on line SPR 8700 Alphen a/d Rijn – Gouda yet to give a punctuality figure: 0 on 0 of the last 30 days (100 needed, on at least 20 days). TrainsRadar data as of 29 Nov 2026, 19:49 (GMT+1).
Reliability · Last 30 days
SPR8700 in NetherlandsNo measured days for this line yet: they appear once its trains report their delay in real time.
Schedule
Sunday 29 Nov · services running that dayNo scheduled services
Routes (1)
- Alphen a/d Rijn – Gouda SPR8700 52 services
Live now
- Active trains
- 0
- On time
- —
- of 0 trains with delay data
- Average delay
- —
No active trains on this line
Stations (7)
Data: the operator’s GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time · Europe/Amsterdam