Too few trains with delay data on line SN71 THURBO yet to give a punctuality figure: 36 on 9 of the last 30 days (100 needed, on at least 20 days). TrainsRadar data as of 23 Nov 2026, 11:30 (GMT+1).
Reliability · Last 30 days
SN71 in Switzerland100%
arrive under 3 min late (36 of 36 measured runs)
−0.3 min
weighted average delay
Small sample: ~4 measured runs a day. 9 days with under 5 runs are hatched.
Average delay by day and hour
Last 5 weeks · local time Europe/Zurich 036912151821
M
T
W
T
F
S
S
Early < −1 minOn time −1 to 3 minSlight 3 to 10 minLate 10 to 30 minSevere ≥ 30 min No data
Hover or focus a cell to see the average delay.
Schedule
Monday 23 Nov · services running that dayNo scheduled services
Routes (5)
Live now
- Active trains
- 0
- On time
- —
- of 0 trains with delay data
- Average delay
- —
No active trains on this line
Stations (19)
Data: the operator’s GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time · Europe/Zurich