PE
Line PE
Reliability ยท Last 30 days
PE in Switzerland ยท excludes PE in Germany100%
arrive under 3 min late (8 of 8 measured runs)
โ0.2 min
weighted average delay
Small sample: ~1 measured runs a day out of ~2 trains seen. 8 days with under 5 runs are hatched.
Average delay by day and hour
Last 5 weeks ยท local time Europe/Zurich 036912151821
M
T
W
T
F
S
S
Early < โ1 minOn time โ1 to 3 minSlight 3 to 10 minLate 10 to 30 minSevere โฅ 30 min No data
Hover or focus a cell to see the average delay.
Schedule
Monday 5 Oct ยท services running that day| Lugano | Bellinzona | Flรผelen | Arth-Goldau |
|---|---|---|---|
| 09:18 | 09:53 | 11:40 | 12:00 |
1 departures in the morning ยท columns in travel order Lugano โ Arth-Goldau โโโ = the train does not stop there
Routes (2)
Live now
- Active trains
- 0
- On time
- โ
- of 0 trains with delay data
- Average delay
- โ
No active trains on this line
Stations (9)
Data: the operatorโs GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time ยท Europe/Zurich