Linie A

Line Linie A

· ZVON Oberlausitz-Niederschlesien

  • 2 routes
  • 6 services
  • 0 trains now

Reliability · Last 30 days

Linie A in Germany
33%
arrive under 3 min late (1 of 3 measured runs)
+7.9 min
weighted average delay

Small sample: ~1 measured runs a day out of ~6 trains seen. 3 days with under 5 runs are hatched.

Hover or focus a bar to see the day.

Average delay by day and hour

Last 5 weeks · local time Europe/Berlin
036912151821
M
T
W
T
F
S
S
Early < −1 minOn time −1 to 3 minSlight 3 to 10 minLate 10 to 30 minSevere ≥ 30 min No data

Hover or focus a cell to see the average delay.

Schedule

Saturday 10 Oct · services running that day
→ Kromlau Waldeisenbahn · Morning
Weißwasser TeichstraßeKromlau Waldeisenbahn
11:3511:55
1 departures in the morning · columns in travel order Weißwasser Teichstraße → Kromlau Waldeisenbahn “—” = the train does not stop there

Routes (2)

Live now

Active trains
0
On time
—
of 0 trains with delay data
Average delay
—

No active trains on this line

Stations (2)

Data: the operator’s GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time · Europe/Berlin