East Midlands Railway
Line East Midlands Railway
In the last 30 days, 60% of the 14,685 trains with data on line East Midlands Railway finished less than 3 min late (30 days with data). Mean final delay: +4 min. TrainsRadar data as of 23 Nov 2026, 18:26 (UTC).
Reliability ยท Last 30 days
East Midlands Railway in United Kingdom60%
arrive under 3 min late (8,884 of 14,685 measured runs)
+4.2 min
weighted average delay
Average delay by day and hour
Last 5 weeks ยท local time Europe/London 036912151821
M
T
W
T
F
S
S
Early < โ1 minOn time โ1 to 3 minSlight 3 to 10 minLate 10 to 30 minSevere โฅ 30 min No data
Hover or focus a cell to see the average delay.
Schedule
Timetable not linked: the line name in the live feed matches no route of the published timetable. Running trains are listed below.
Live now
- Active trains
- 52
- On time
- 63%
- of 52 trains with delay data
- Average delay
- 3 min
Data: the operatorโs GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time ยท Europe/London