In the last 30 days, 49% of the 330 trains with data on line Downeaster finished less than 3 min late (30 days with data). Mean final delay: +8 min. TrainsRadar data as of 23 Nov 2026, 12:37 (GMT-5).
Reliability ยท Last 30 days
Downeaster in United States49%
arrive under 3 min late (163 of 330 measured runs)
+8.3 min
weighted average delay
Small sample: ~11 measured runs a day.
Average delay by day and hour
Last 5 weeks ยท local time America/New_York 036912151821
M
T
W
T
F
S
S
Early < โ1 minOn time โ1 to 3 minSlight 3 to 10 minLate 10 to 30 minSevere โฅ 30 min No data
Hover or focus a cell to see the average delay.
Schedule
Timetable not linked: the line name in the live feed matches no route of the published timetable. Running trains are listed below.
Live now
- Active trains
- 3
- On time
- 100%
- of 2 trains with delay data
- Average delay
- 0 min
Data: the operatorโs GTFS timetable; punctuality and delays measured by TrainsRadar from real-time positions. Times in local time ยท America/New_York