Are trains on time in Czechia? Monthly punctuality

In October 2026 only 5 of the 31 days have a known delay for at least 30% of the trains tracked in Czechia (98,841 with data out of 247,491 in the month): the monthly figure would rest on a few days, so it is not published.

Month by month

last known delay < 3 min · 95% Wilson CI
Month by month
MonthTrains trackedWith dataCoverageOn time (< 3 min)95% CIMedianStatus
November 2026161,30447,51729.5%–––sample or coverage too small: no figure
October 2026247,49198,84139.9%–––irregular coverage (5 of 31 days): no figure
September 2026252,764252,729100%73.6%73.5%–73.8%0 minclosed
August 2026253,370253,303100%70.2%70%–70.4%0 minclosed
July 2026170,824170,770100%72.5%72.2%–72.7%0 minincomplete month: data from 11 July 2026

We give a month’s figure when we know the delay of at least 3,000 trains and 30% of the trains tracked. Below that, no figure is published and the page is not offered to search engines.

Our threshold and the official one

Our main figure counts a train as on time if its last known delay is under 3 minutes, at any point of its route. It is the same rule for every country and nobody’s official figure: operators usually measure at arrival at destination, at 5, 6 or 15 minutes, sometimes per passenger.

Arrivals at destination observed from 13 November 2026 to 20 November 2026 (8 days, 18,188 arrivals). Share arriving at destination less than:

  • < 5 min at destination 82.7 %
  • < 6 min at destination 86.8 %
  • < 15 min at destination 98.0 %

A dash means we saw too few arrivals, or the source cannot measure that threshold (in France, below 5 minutes). They only cover those days (we record arrival at destination since 13 November 2026): do not set them next to an official monthly figure for another period.

We have not verified this country’s punctuality threshold in an official source, so we do not quote one. How we measure

Operators (October 2026)

those in the monthly report: 3,000 or more trains with data and enough coverage

How it is calculated

  • On time = less than 3 min late on the last known delay of each train, the same rule on every TrainsRadar page. Only trains whose delay we know are counted. It is not any operator’s official figure.
  • We give a month’s figure when we know the delay of at least 3,000 trains and 30% of the trains tracked. Below that, no figure is published and the page is not offered to search engines.
  • The per-train record starts on 10 July 2026; the monthly reports in August 2026; arrival at destination and cancellations on 13 November 2026. Each country has data since its real-time source was connected, and a month that started part-way says so.
  • These figures do not say why trains are late: TrainsRadar does not attribute causes (strikes, storms, engineering works) that the data does not show.
  • Full methodology